The direction, in dates
- March 2021Operation 300bn launched
The national industrial strategy sets the AED 300 billion target for 2031.
Source - April 2026ICV becomes mandatory in selected sectors
The Cabinet approves the change and a AED 1 billion resilience fund.
Source - May 2026Make it in the Emirates 2026
Offtake, financing and localisation commitments are announced.
Source - November 2026ADNOC's new ICV model
ICV becomes part of the bid: 70% commercial, 30% ICV.
Read the note - 2031The target year
Industry's contribution to GDP is to reach AED 300 billion.
Source
The priority sectors
The national strategy names priority sectors. If your product sits in one of them, more of the support is designed for you.
- Food, beverage and agricultural technology
- Pharmaceuticals
- Electrical equipment and electronics
- Petrochemicals and chemical products
- Rubber and plastics
- Machinery and equipment
- Hydrogen
- Medical technology
- Space technology
UAE Government portal, Operation 300bn, updated 30 Dec 2024
Mainland or free zone?
It is the first question most manufacturers ask. The short version, from the official texts:
| Question | Mainland industrial area | Free zone |
| ICV treatment | A supplier holding an industrial licence counts as a goods manufacturer, within the UAE. | The same: a licensed goods manufacturer in a free zone counts as within the UAE. |
| Made in UAE and GCC | Goods can be certified Made in UAE and can have duty-free status in the GCC region. | Described as suitable for industrial projects targeting markets outside the GCC region. |
| Land in KEZAD | Serviced industrial plots are listed at the same rate for both: AED 32 to 38 per square metre per year. |
| What decides | The industrial licence, more than the location. Where most of your buyers are, in the UAE and the GCC or outside, then points to the zone. |
MoIAT, National ICV Certification Guidelines for Suppliers · KEZAD Group, mainland page, 31 Jul 2026 · KEZAD Group, free zone page, 17 Jun 2026 · KEZAD Group, tariffs page, 8 Jul 2026
What the industrial register asks for
- A local industrial licence first, then the federal industrial production licence.
- Not less than 10 employees and capital of not less than AED 250,000, as stated on the service page.
MoIAT, industrial production licence service page
What to check before you invest
- Which programmes apply to your product, your licence and your location.
- The conditions behind each rebate or exemption, and how long it lasts.
- Whether your activity qualifies for an industrial licence. Assembly and testing need to be confirmed with the licensing authority.
- How the licence, the location and the first assets will count in your ICV score.
- Whether to start with an agent, a facility, or both.
Where Roots Limitless helps
We plan the localisation with you: an entry study, the right set-up partners, and a facility and investment plan with ICV built in from the first asset. We work toward the local incentives, connect you with the right people in finance and in the incentive programmes, and present different scenarios. See UAE market entry and localisation.
Request a 20-minute call